检查井盖模具适用范围
Application scope of manhole cover mould
1)一般土质、软土土质、季节性冻土土质和湿陷性黄土土质条件下的塑料排水检查井施工;
1) Construction of plastic drainage inspection well in general soil,
soft soil, seasonally frozen soil and collapsible loess soil;
湿陷性黄土湿陷性黄土
Collapsible loess collapsible loess
2)一般车道的地面荷载按汽车总重15t(后轮压5t);消防车道的地面荷载按汽车总重30t(后轮压6t)设计。
2) The ground load of general lane is designed as 15t of total vehicle
weight (5T of rear wheel pressure); the ground load of fire lane is
designed as 30t of total vehicle weight (6T of rear wheel pressure).
3)建筑小区(居住区、公共建筑区、厂区等)范围内埋地塑料排水管道外径不大于800mm、埋设深度不大于6m、不下井操作的塑料
框格护坡模具 箱体护坡模具 华尔街铜牛 电阻柜 接地电阻柜 电缆保护接地箱 隔离墩模具 化粪池模具排水检查井工程的设计、施工和维护保养。
3) The design, construction and maintenance of the plastic drainage
inspection well project within the scope of the construction community
(residential area, public building area, plant area, etc.) with the
external diameter of the buried plastic drainage pipeline not more than
800mm, the buried depth not more than 6m and the operation of not going
down the well.
4)地下水位按地面下不高于1.0m设计;
4) The underground water level shall be designed as no higher than 1.0m under the ground;
5)抗震设防裂度为9度及9度以下的地区。
5) The area with anti-seismic crack degree of 9 and below